Frequently Asked Questions
Fully funded, turnkey EV charging infrastructure in the right locations, helping you scale your network.
Infrastructure as a Service (IaaS)
What is Infrastructure as a Service (IaaS)?
Infrastructure as a Service (IaaS) is EVN’s fully funded, end-to-end solution for EV charging infrastructure. We identify and secure sites, fund, develop and build the charging infrastructure, and provide ongoing maintenance, enabling our partners to operate the chargers without the upfront capital requirement.
What benefits does IaaS offer to businesses and landlords?
By partnering with The EV Network, businesses and landlords can:
- Benefit from a fully funded EV charging solution with no upfront capital requirement.
- Increase site footfall and dwell time.
- Generate long-term rental income at competitive market rates.
- Benefit from future-proof infrastructure that is maintained and refreshed throughout the lease term.
What are the key components of The EV Network’s IaaS?
- Site Identification and Acquisition: Finding and securing optimal locations for EV charging infrastructure.
- Design and Planning: Developing customised plans for each site, ensuring efficiency and compliance.
- Construction and Installation: Building and installing the necessary infrastructure and equipment.
- Operation and Maintenance: Providing ongoing support and maintenance to ensure reliable operation.
What are the benefits of partnering with EVN for CPOs?
CPOs partnering with EVN can benefit from:
- A fully funded solution with no upfront capital requirement.
- Access to EVN’s development pipeline of strategically located sites.
- End-to-end delivery, from site identification and development through to construction and ongoing maintenance.
- Reduced development and operational risk.
- A long-term infrastructure partner, enabling CPOs to focus on operating and growing their charging network.
Legal
Does EVN instruct external law firms?
All English and Welsh sites are dealt with entirely by our highly experienced in-house legal team. Some aspects of the legal work for Scottish and Irish sites are handled by our external law firm; however, EVN’s in-house legal team remains the point of contact for all sites regardless of jurisdiction.
Who prepares the legal documents?
EVN’s legal team will prepare a standard form agreement for lease and lease to reflect the agreed heads of terms.
What legal documents are required in relation to the electricity connection for the site?
Depending on the DNO, there will either be a substation lease or a licence and a wayleave or easement.
Once legal documents are agreed, how quickly will they be signed?
We seek regular approval of key terms within the documents which means the final approval and signing process can be turned around in 3 days or less.
How quickly can we exchange contracts after heads of terms are signed?
We carry out high level title due diligence inhouse without needing to instruct external lawyers. Title DD is done in parallel with finalising legal documentation with the landlord. We aim to complete both processes within 6 weeks, but this is usually quicker where the landlord’s lawyers are fully engaged with ours.
Finance
How does the CPO pay EVN for the infrastructure?
Once a CPO indicates interest in a site, we provide them with a fixed annual service fee. This covers development, construction, maintenance and land rent. The service fee is typically paid over 20 years and split into three periods:
- Years 1-5: A lower service fee to support the initial years of lower utilisation.
- Years 6-10: The service fee increases to a secondary rate.
- Years 11-20: Following a charger refresh at year 10, the service fee is fixed for the remainder of the agreement.
When does the service fee become payable and for how long?
The service fee becomes payable once the CPO begins operating the site and is paid for the duration of the agreement, typically 20 years.
How do service fees work?
Service fees are profiled and typically split into three periods over the term of the agreement. The first period has a lower service fee to support CPOs during the initial years of lower utilisation, with the service fee increasing in later periods.
What operational expenses are included in the service fee?
Operational expenses include inspection and maintenance costs, asset management costs (with services provided by EVN Services), land rent, equipment insurance, repair costs and other costs that are fixed and known in advance.
Do I pay the service fee to EVN?
The CPO pays Zood Infrastructure Ltd a fixed annual service fee, billed quarterly in advance, for the duration of the agreement
What’s the average CAPEX per site?
For a site with 3 × 300kW chargers the average total CAPEX is c. £550k.
For a site with 6 × 300kW chargers the average total CAPEX is c. £1,010k.
What’s included in the CAPEX?
The CAPEX per site includes grid connection costs (including point of connection (PoC), substation and cabling costs), charger equipment, on-site costs (including EPC, civils and other works), development costs (including planning and legal fees), and project management costs.
What’s the average capital expenditure (CAPEX)?
The capex is fully paid by SDCL Energy Efficiency Income Trust plc (“SEEIT”)
Do you envisage any replacement CAPEX for the chargers?
Refresh CAPEX is expected after 10 years, as the chargers currently have an expected useful life of 10 years. This cost is included in the service fees paid by CPOs.
CPO
How do I sign up as a CPO?
The first step is to sign our Framework Services Agreement, which sets out how the relationship will work.
Once signed, we will onboard you to our online platform, where you will have a dedicated, real-time report showing you all the information about the sites we are developing for you.
Once you confirm interest in a site, we provide you with the economics to approve. From there, the Site Acceptance Schedule is signed between us, which acts as the formal acceptance of a site.
What are the benefits of partnering with EVN for CPOs?
CPOs partnering with EVN can benefit from:
- A fully funded solution with no upfront capital requirement.
- Access to EVN’s development pipeline of strategically located sites.
- End-to-end delivery, from site identification and development through to construction and ongoing maintenance.
- Reduced development and operational risk.
- A long-term infrastructure partner, enabling CPOs to focus on operating and growing their charging network.
Which CPOs do you work with?
We work with a range of leading charge point operators, including Allego, bp pulse, Duracell E-Charge, E.ON, Fastned, IONITY and ESB Energy.
How do you decide which sites to offer to CPOs?
All our CPOs have varying site strategies and geographic requirements. Equally, we have plenty of sites to satisfy all our CPOs.
Who takes care of maintenance, the CPO or you?
Currently, we provide maintenance services to all of the CPOs that we work with. The cost of this service is included in the service fee. Our maintenance team is in-house and covers remote monitoring as well as physical maintenance.
Planning & Development
What is power and planning?
Power and planning involves securing the required grid connection and planning permissions for an EV charging site. EVN manages this process to ensure the necessary power and approvals are in place before the site progresses to construction.
How does the design and construction process work?
EVN manages the design and construction process from start to finish. Each site is designed to meet its specific requirements and our CPO partner’s specifications, before EVN manages the construction and installation of the charging infrastructure through to energisation.
How much installation space do you need?
We need 2 metres of space behind a parking bay to install a charger. This allows room for the charger itself and sufficient space for maintenance activities. We also need to allow space for a substation and feeder pillar on the site. These two pieces of equipment provide power from the grid to the chargers.
A substation requires an area of approximately 5 metres by 5 metres, while the feeder pillar requires an area of approximately 4 metres by 2.5 metres. We always look to install the equipment as efficiently as possible to minimise the space required.
Do you need to allow for accessible EV charging bays?
Yes, EV charging has its own accessibility standards under PAS 1899:2022. These standards are specific to EV charging and are therefore slightly different from standard accessible parking bays on a retail site. The additional requirements for EV accessible bays ensure there is clear access around all four sides of the parking bay, providing clear access to both the charger and the vehicle.
Due to these requirements, an accessible bay takes up more space on the site and needs to be factored into our designs from the outset. Typically, one PAS 1899:2022 bay takes up the space of two standard parking bays.
Do you need to install a substation on the site?
As we install ultra-rapid 300kW chargers, we have a large demand for power from the grid. This means we often need to source High Voltage (HV) connections. When bringing power into the site at HV, we need to install a substation to transform the power down to Low Voltage (LV), allowing the chargers to distribute power to electric vehicles.
Substations typically require a 5 metre by 5 metre installation space, and the local electricity network operator has clear regulations around access. Substations need to be accessible 24/7 and have vehicular access. These are all aspects that will be considered during the design process.
Do you install your own lighting?
We will undertake a review of the existing lighting on the site. If we feel the site would benefit from additional lighting, we will propose installing new lighting columns to illuminate our EV bays and provide the best possible customer experience.
Who builds the sites?
All EVN projects will have an assigned project manager who works with one of our framework Independent Connection Providers (ICPs), who oversee the installation of our hubs. Depending on the size and scope of the project, we may have more than one contractor delivering the works.
How do we choose our suppliers?
Every project is tendered competitively. Once tenders are received, we use our internal processes to select the contractor who will be assigned to the project. We also factor in current workload and geographical location to ensure we’re working as efficiently as possible.
Property
What are the benefits of installing EV charging stations for landlords?
Installing EV charging stations offers several benefits, including:
- Attracting and Retaining Tenants: Providing EV charging can make your property more appealing to current and prospective tenants.
- Enhancing Property Value: Properties with EV charging stations can see an increase in value.
- Sustainability Credentials: Demonstrating a commitment to sustainability can enhance your reputation and appeal to environmentally conscious tenants.
How does site acquisition work?
Our property team identifies and assesses potential sites based on their suitability for EV charging. Once a suitable site is identified, we work with the landlord to agree terms and secure the site, before progressing through power, planning, design and construction.
What criteria do you look for when choosing a location?
We are looking for prominent locations in areas with high traffic flow (ideally a minimum of 15,000 passing vehicles) and either facilities in the immediate surroundings or the ability to construct these on site for our customers.
What size hub are you looking for?
Anything from a 2-bay EV hub alongside retail to a 24-bay hub on a large 2-acre+ plot for future development. Ideally, we are looking for a minimum of 6 EV bays.
Do you lease or purchase land?
We are interested in leasing and purchasing sites.
What if the landlord does not own the freehold of the site?
We will advise on a site-by-site basis, but we are willing to take a sublease interest, although superior landlord(s) consent may be needed.
What do our standard lease terms look like?
Our standard lease terms are either 20 or 30 years, with rents indexed annually by CPI.
Will you take a flexible lease?
No, we require a minimum 20-year lease
Which entity takes the lease and what is its covenant strength?
The lease is taken by Zood Infrastructure Ltd, part of The EV Network. EVN is the UK’s leading developer and investor in EV charging infrastructure, delivering fully funded, long-term charging solutions.
Do you need 24/7 access?
Yes.
Who pays for the electricity connection?
EVN pays for the electricity connection and all associated grid costs.
Who pays for the construction of the site?
EVN pays for the construction of our sites.
Who manages the customer relationship?
The customer experience will flow through our workstreams. Initial engagement will be with our property team, where the opportunity for EV charging is discussed. Once a suitable location has been identified, our pre-construction team will work on a site design to maximise the site’s potential. Once the site has been designed and agreed with the customer, the relationship is handed over to the construction team, who will see the project through to completion.
Operations & Maintenance
What does operation and maintenance involve?
EVN provides ongoing operation and maintenance support to help ensure charging infrastructure remains reliable and operational. This includes monitoring performance, carrying out routine maintenance and responding to issues when required.
What chargers do you install?
We predominantly install 300kW and 400kW ultra-rapid chargers. However, we remain flexible depending on the requirements of each site and continue to adapt as charging technology evolves.
How do we integrate the chargers into our system?
Once commissioned, the chargers are connected to our back-office system, allowing our operations team to remotely monitor their performance.
The equipment is continuously monitored, enabling us to identify any issues once the site is energised. Where an issue requires on-site support, our field service engineers (FSEs) are deployed to investigate and resolve it.
Who manages the site?
Each project is overseen by the assigned project manager, with the support of the construction director and wider construction team.
Who is responsible for branding?
Working with our CPO partners, each site is reviewed from a marketing and branding perspective. We work with multiple branding companies, covering everything from bay markings to digital advertising.
Delivering fast, scalable EV charging infrastructure across the UK, Europe and USA. Contact us today to see how can we help