From Trade Park to Charging Hub
Spotting the potential at Minworth, Birmingham
In 2021, EVN began developing a new ultra-rapid charging hub at Minworth Trade Park on Forge Lane, Birmingham.
Located within an established commercial area, Minworth offered the foundations for a well-positioned charging site. The A38 provides convenient access, while the surrounding businesses bring regular activity to the area.
Working alongside E.ON Drive, EVN set out to turn this opportunity into a new ultra-rapid charging destination. Over the following two years, the team brought together the land, planning, grid connection and electrical infrastructure needed to bring the project forward. Construction was completed in 2023, delivering a new charging hub for Minworth Trade Park.
At a Glance
CPO
E.ON Drive
Location
Minworth Trade Park, Forge Lane, Birmingham, West Midlands
Project timeline
2021–2023
Charging provision
6 ultra-rapid charging bays
Charging infrastructure
3 ultra-rapid chargers
Nearby amenities
Costa Coffee, Toolstation and Screwfix
Nearby A38 traffic
27,319 vehicles per day (2024)
EVN scope
Development through to delivery
Why Minworth Worked
Road connectivity, passing traffic and an established commercial setting
Minworth Trade Park benefits from its proximity to the A38, with an average of 27,319 vehicles passing nearby each day in 2024.
The location also offers drivers convenient access to a range of nearby businesses and amenities, all within a short walk. Costa Coffee is approximately 131 metres away, with Toolstation around 60 metres away and Screwfix around 133 metres away.
This combination of road connectivity, passing traffic and established businesses made Minworth an attractive location for EV charging. It provided the opportunity to develop a hub that fitted naturally into an already busy commercial setting, offering drivers convenient access to charging alongside their everyday journeys.
Unlocking the Site
Bringing power, planning and design together
Before construction could start, EVN needed to bring several parts of the development together and establish a clear route to delivery.
Power formed a significant part of that work, Ultra-rapid charging places substantial demands on a site’s electrical infrastructure, so EVN progressed the grid connection alongside the electrical design and wider development programme.
Meanwhile, planning and site design moved forward in parallel. EVN developed the charging layout and supporting infrastructure around the practical requirements of the site, while coordinating these elements with the power solution.
Birmingham City Council approved the planning application in December 2021. Following approval, EVN continued to progress the grid, electrical, commercial and legal workstreams needed to move Minworth into construction.
Bringing Minworth to Life
Building the infrastructure behind six ultra-rapid charging bays
With the key development requirements in place, Minworth moved into construction. EVN coordinated contractors, site works, electrical installation and charger installation throughout the build.
A significant part of the work took place behind the scenes, with the electrical infrastructure playing a central role in making the site operational. This included HV cabling, an RMU, transformer and LV substation metering, providing the infrastructure required to support the ultra-rapid charging equipment.
The completed site features three ultra-rapid chargers, providing a total of six charging bays at Minworth Trade Park.
By 2023, the project had progressed from an initial site opportunity to a completed EV charging hub.
From Potential to Power
Six new ultra-rapid charging bays for Minworth Trade Park
Today, Minworth provides drivers with access to high-powered charging in a convenient commercial location, close to the A38 and a range of everyday amenities.
Behind the completed site is two years of coordinated work across site development, planning, grid connection, electrical infrastructure and construction.
EVN brought these elements together, managing the project from its early development stages through to delivery.
Minworth demonstrates how well-positioned commercial land can be developed into valuable EV charging infrastructure, with EVN supporting the process from initial opportunity through to completion.
Looking to unlock the potential of your site?
Whether you’re a landowner, Charge Point Operator (CPO) or strategic partner, EVN can help turn your site into an opportunity for EV charging.
Speak to our team to find out how we can support your project, from site development and pre-construction through to delivery and handover.
Delivering fast, scalable EV charging infrastructure across the UK, Europe and USA. Contact us today to see how can we help